D365 F&O: Assigning Project Resources
Video transcript
00:00:01
In this video.
00:00:02
We'll assign resources to a project using the variety of methods.
00:00:06
So we've already created a.
00:00:08
Project which we can see is not currently staffed. We can assign a resource directly from here by simply adding a role.
00:00:21
We can then choose the role from here and see the matching resources.
00:00:30
Or we can open the booking calendar.
00:00:35
This again shows the matching resources for that role. We can expand.
00:00:42
Our choice and specify.
00:00:46
Additional characteristics.
00:00:53
And here we can see the availability.
00:00:58
And the details of existing bookings.
00:01:04
And if we wish to book, we can soft or hard book to various capacities.
00:01:15
By using this toggle we can ignore the specified standard working hours and assign to hours outside the stamped calendar.
00:01:27
Another way to resource the project is through.
00:01:29
A work breakdown structure.
00:01:33
So we'll import our very basic.
00:01:43
And we'll use this to resource our project.
00:01:48
We have to publish it first of all.
00:01:52
And we can do this in a number of ways. We can do this.
00:01:56
Manually by launching the cooking form again.
00:02:02
And seeing who's valuable and.
00:02:07
Soft or hard assigning.
00:02:12
Or we can do this automatically.
00:02:17
Simply by clicking and here the system chooses the available resource that matches the required role.
00:02:29
We can also generate a team for the entire WBS.
00:02:40
So only return to our.
00:02:44
Project main page. We see this is now sourced and we have to fulfil the resources.
00:02:56
And we can do that all from this page here.
00:03:00
So by role we can.
00:03:03
Book by simply assigning and then move on.
00:03:09
To the next row.
00:03:11
And once again, book according to the availability calendar.